A REFRESHING IMPROVEMENT TO ANY BATHROOM

There is only three easy steps for installation.

  Step 1:

Close the stop valve. Unscrew the supply line.

Step 2:

Connect the supplied shut-off valve to the tank first, then connect your supply line to the shut-off valve. Turn on the stop valve and make sure there is no leaks.                    

Step 3:

Peel and stick the wall hanger 32" from the floor. Make sure the arrow is pointing up.